Monday, September 15, 2014

A few days of work...

Thursday 9/11 Progress

The electricians returned and pulled all the wires for the first floor and the lead wires from the basement for all of the second floor circuits.  Also, the vent for the 2nd fan in the master bath was installed.  And last but not least, the concrete guys came and poured the front porch.

Friday 9/12 Progress

The electricians returned again and finished the 2nd floor 110 V wiring.  They also got the 1st floor low voltage wiring done.  The concrete guys were there again to prep the basement and garage floors for pouring, i.e. vapor barrier and rebar.

Monday 9/15 Progress

The electricians finished the low voltage wiring upstairs.  The concrete was poured for the basement and garage floors.  I appreciate the slope in the garage, 4" drop from back to front.  I also saw the project manager and scheduled a meeting with him for tomorrow to address some problems I have seen.  Most of them are due to sloppy work, i.e. cutting cross-members in walls to run duct work, but not adding strapping to add integrity back to the wall.   Also, my tankless hot water heater was delivered over the weekend.  My wife is looking forward to neverending hot showers (I am not looking forward to the bills).

I should have some more pictures tomorrow, as well as a better understanding of the upcoming schedule.