- The air ducts in the garage walls will see an additional bump out of studs around them to add insulation. This is by design.
- The drain pipe in the garage wall is supposed to be the vent pipe. this will be fixed.
- The soffit is going to be removed in the living room.
- The HVAC guys forgot to put the 2nd vent in the master bathroom.
- The electricians will be there today and then they may get interrupted by the concrete pour in the garage and basement. This is up in the air.
- I asked about a closing date and was told late October. He said if he can, he will make up a few days. Additionally, if we can do a walk through and close on the same day, he said we might be able to get it as early as October 24th. I think if I keep on them with problems as I have been, a walk through and close in the same day may be possible.
Wednesday, September 10, 2014
Update
I met with the electrician today and confirmed everything that I wanted installed. This was a chance meeting as I was just dropping by. I also ran into the Project Manager. So here are some things I found out today: